Transforming water and electricity is an important step in finishing a house and building a foundation. As a hidden project in house, if there is a problem, then it will be difficult to find out. It will be too late to regret after decoration is completed. Today I dismantled details that you should pay attention to when renovating a hydroelectric power station, friends who need it, please collect!
1. The wires on wall should not be open
If wires are exposed on wall, after a long time, aging and leakage will easily occur, which will affect our life safety.
2. Strong and weak electricity cannot be next to each other
When building hydroelectric power plants, it should be borne in mind that strong and weak electricity cannot be adjacent to each other, distance between them must be more than 30 cm, otherwise it will easily lead to a deterioration in network signal in house.
3. The setting of outlet should be combined with size of furniture
When determining location of outlet when repairing water and electricity, do not forget to consider placement of furniture in future, it is best to measure dimensions of furniture in advance and reserve location of furniture to avoid unnecessary hassle.
4. Wiring at top of bathroom wall should be neat
Positioning wiring at top of bathroom wall is very important. The general standard for decorative finishes is for wires to go up and plumbing pipes to go down. This is done to facilitate future maintenance. It is better not to put water and electricity together.
5. Water pipes must be pressure tested
It is very necessary to pressurize water pipe. This must be done after waterway has been laid. As a rule, it takes more than 30 minutes to press water pipe eight to ten times. The water pipe test must be done at least twice.