Renovation is a big deal and there are a lot of details that need to be paid attention to when decorating. Many people ignore them when finishing, and find out about it only after completion of work, which brings a lot of inconvenience to our lives. Today I'm going to break down some of things you need to pay attention to when decorating!
1. Reconstruction of a hydroelectric power plant
Water and electricity are most important link in finishing. From beginning of finishing, water circuit is laid, until installation of lamps and lanterns after finishing, water and electricity pass through entire construction process. In addition, water pipes and wires are buried in wall, and in event of a malfunction, it will be very troublesome to repair them. Therefore, quality of hydraulic installation must be guaranteed.
2. Door installation
Doors are usually finished doors. Before installation, you must determine height, and also install door or floor first. This must be determined in advance, otherwise size of door may not be suitable. Failed to continue installation.
3. Wall decoration
Walls are very important in finishing, especially kitchen and bathroom walls. The bathroom wall should be well waterproofed, as should moisture-proof treatment. The kitchen wall must be fireproof and the material must not be wood or wall cladding.
4. Land Decoration
During finishing of floor, especially in bathroom, it will be very humid. When we choose floor tiles, we must choose non-slip and waterproof materials. What we must pay special attention to is that when buying floor tiles, we must prepare a few more pieces so that they are not enough.
5. Circuit breaker socket redundancy
The socket issue is also a very minor issue. The height of power outlet and ground must be at least 30 cm, and distance between switch and the ground must be at least 1.4 m.
6. Device installation
Appliances are required and generally cannot be brought in until after home has been finished. Therefore, size of electrical appliances must be communicated to construction personnel in advance, and sufficient space must be reserved to avoid running out of space and not being able to install.