I received keys to house in September. I was too busy with work and didn't have time to do repairs. It wasn't until Chinese New Year that I spoke to company about renovation. The construction started after first month. The renovation was completed after 2 months in a row. I did it, but did not have time to put furniture in yet. I did cleaning several times. It is really not a boast to clean it. My relatives and friends say that it is beautiful and has a long face.
There is no sophisticated and atmospheric finish. The living room is covered with floor tiles, and walls are only painted with water-based paint. Initially, I wanted to get a different color, but furniture is all simple and ordinary styles. color is better. .
Two of bedrooms have old wooden floors and are furnished with a range of wardrobes just waiting for bed and bedside tables and other furniture.
There is also a small window in bathroom, which is much better than original house with hidden kitchens and security, and it's easier to ventilate.
The kitchen is an elongated space, and a small balcony opens straight up, leaving outermost space for refrigerator. To provide better lighting, all walls and floor tiles are painted in a light color.
The second bedroom is smaller, and children's room has space for a desk, and size is calculated.
In dining room and living room, simple stretch ceilings are also installed. What I like more is warm yellow light bar design. Even chandelier is preselected.
Finally, let's make a close-up of hallway. Cabinets on side are not so easy to photograph in their entirety. These are also bespoke cabinets. White cabinets are best combined with furniture. Overall effect Still very satisfactory. Just wait until furniture is dry. Can you move, do you think?